Ops Performance

Operational Analysis

Milestone approval rates, rejection trends, and install quality metrics for EPC partners.

Platform-Wide Benchmarks

54%
M1 First-Time Approval (Avg)

Milestone 1 first-time pass rate across all EPCs. Top performers exceed 90%. The #1 rejection driver is Enphase PV Maintainer configuration.

53%
M2 First-Time Approval (Avg)

Milestone 2 first-time pass rate. Primary blocker: consumption data correlated with solar production — typically caused by faulty CT installations.

16%
Top Activation Blocker

CT Installation & Configuration accounts for 16% of all activation rejections — the single largest blocker to getting systems live.


What's In Your Ops Report

Milestone Rejection Analysis

M1 and M2 approval/rejection rates with specific queue flag breakdowns. Identify the top 3 issues dragging your pass rate down.

Cycle Time Performance

NTP-to-Install, NTP-to-Activation, and backlog aging metrics compared to platform medians (49d and 133d respectively).

Install Quality Scoring

First-time pass rates, rework frequency, and quality trend analysis over rolling 90-day windows.

Peer Benchmarking

Your metrics compared against anonymized peer EPCs in your size category and the Platinum benchmark standard.

Backlog & Aging Analysis

Active project backlog broken down by pre-install vs pre-activation, with aging cohorts and stale project flags.

Channel Tier Impact

How your operational performance maps to LightReach channel tiers: Certified, Pro, Elite, and Platinum.


Operational Excellence = Tier Advancement

Tiers are earned, not given. Based on 6 KPIs: install quality, aging backlog, NPS, collections, tranche execution, and volume.

Certified

Entry tier for new LightReach partners. Baseline operational standards and onboarding completion required.

Pro

Demonstrated operational consistency. Above-average first-time pass rates and collection performance.

Elite

Top-quartile performance across all 6 KPIs. Priority pipeline access and enhanced support.

Platinum

Only 13 EPCs in 2026. The highest standard in solar. These are the partners LightReach trusts most with pipeline.

Request Your Operational
Performance Report

Contact your LightReach Regional Manager for your EPC-specific milestone and quality analysis.